We are about to start the long crazy process of covering the repaired area of the wing with Ceconite and I have a couple questions. The area is about 2 foot x 4 foot top and bottom.
- Where the seam tape lays over the original finish, does that area have to be scuffed to a allow for proper adhesion?
- After looking through the Ceconite manual and counting approximately 16 sprayed layers, I was wondering if there was an easier process that perhaps I'm missing.
Thanks in advance for your time......
'
We are about to start the long crazy process of covering the repaired area of the wing with Ceconite and I have a couple questions. The area is about 2 foot x 4 foot top and bottom.
- Where the seam tape lays over the original finish, does that area have to be scuffed to a allow for proper adhesion?
- After looking through the Ceconite manual and counting approximately 16 sprayed layers, I was wondering if there was an easier process that perhaps I'm missing.