----- Original Message ----- 
 From: Hugh Loewenhardt 
 To: 
fairchildclub@yahoogroups.com   
 Sent: Sunday, October 09, 2011 11:00 PM
 Subject: Re: [fairchildclub] help with riveting PT-26 elevator trailing edge
 
 Shergei, How about inverting the rivets (heads on the inside), bucking the heads against a dimpled steel plate and heading the the rivet tails on the outside of the workpiece with a ballpeen hammer. Get some trailing edge material and make a trial run to ensure it works to your satisfaction.
 
 ________________________________
 From: shergei2001 
 To: 
fairchildclub@yahoogroups.com  
 Sent: Sunday, October 9, 2011 6:05 PM
 Subject: [fairchildclub] help with riveting PT-26 elevator trailing edge
 
 I had to remove some elevator ribs on my PT-26 project and am having trouble riveting the ribs back on the trailing edges. The rivets are AN470-AD3-3, and there is no room for a bucking bar or squeezer. I tried two attempts at making a backing bar, but both were too flexible. One is shown in the "PT-26 elevator trailing edge riveting" photo album located here, along with other photos and dimensions: 
 
http://groups.yahoo.com/group/fairchildclub/photos/album/751573116/pic/list
 Even more difficult will be riveting on the trailing edge/trim-tab rib gussets to the trailing edge, but there has to be a way to do this! Any help would be greating appreciated. Thanks, Pete Crawford
 
 [Non-text portions of this message have been removed]
 
 [Non-text portions of this message have been removed]
 
 
 
 
 
 [Non-text portions of this message have been removed]